![](https://thesolarsystemandbeyond.wordpress.com/wp-content/uploads/2014/07/sls4.jpg?w=500)
(RS-25 rocket engine No. 0525 positioned in preparation for testing – Photo Credit: NASA)
Engineers at NASA have taken a crucial step in the construction of agency’s Space Launch System (SLS) by installing one of the rocket’s RS-25 engines on the A-1 Test Stand at the Stennis Space Center in preparation for extensive assessments. Continue reading